THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27., This news data comes from:http://771bg.com
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.

During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- House resumes budget briefings
- Social media erupts: Politicians' children face backlash for flaunting wealth
- House suspends DPWH budget deliberations pending submission of changes by agency, DBM
- BuCor chief calls for major reforms
- Manila mayor warns against mobs, orders police to maintain peace and order
- Jollibee, DepEd partner to develop quick service restaurant curriculum for senior high
- Anutin elected as Thailand's new prime minister
- ICC postpones Duterte’s confirmation hearing after defense panel cites fitness concerns
- Japan PM decides to quit as opponents seek leadership election: reports
- Wawao Builders exec ‘not sure’ if company has flood control project in Bulacan